Our Group
Choose one specialist for a defined requirement, or engage the group when the project needs joined-up thinking.
How Sysflex protects the technology outcome for the party who is still in the building long after everyone else has left.
WHO WE HELP
Your challenges
A number is carried in the budget long before anyone has established what it needs to buy, so it is either badly wrong or quietly spent on the wrong things.
Each package is delivered correctly and the joins between them belong to no one, which is where the problems appear.
Practical completion can be signed with no support arrangement, no documentation and no one in your team able to operate what has been installed.
How we support you
01
RIBA 0 – 1
Establish what the building must achieve operationally, and turn it into a budget that means something.
02
RIBA 2 – 4
Hold your interests in the design team, so technology is coordinated rather than accommodated.
03
RIBA 5
Verify that what is installed matches what was specified, before you accept it.
04
RIBA 6 – 7
Keep the lifecycle view, so the building continues to work as the organisation changes.
What you receive
Sysflex sits on your side of the table. We hold the technology outcome while the contractor holds the contract and the consultants hold their packages, which means someone is accountable for whether the building actually works for you.
✓ A technology brief that states what the building must achieve operationally, in language suppliers can price.
✓ A responsibility matrix showing which party owns each system and each interface.
✓ Independent review of designs, tenders and supplier responses before you commit.
✓ A handover position with documentation, credentials, warranties and a working support route.
✓ A lifecycle plan, so replacement and renewal are budgeted rather than discovered.
Specialist delivery
Provides the infrastructure and ongoing managed support once the building is occupied.
Delivers the workplace and meeting room technology your people use every day.
Delivers access control and surveillance coordinated with the building, not bolted on afterwards.
Start a conversation