Our Group
Choose one specialist for a defined requirement, or engage the group when the project needs joined-up thinking.
How Sysflex strengthens the technology workstream alongside an M&E appointment without competing for ownership of it.
WHO WE HELP
Your challenges
The technology brief is incomplete at the point your design decisions have to be made.
Power and containment are provided to a point, and what happens beyond that point is nobody’s documented responsibility.
Riser capacity, comms room size and cooling are set before anyone has sized the systems they will carry.
How we support you
01
RIBA 0 – 1
Turn the client’s operational needs into technology loads and spatial requirements you can design against.
02
RIBA 2 – 4
Issue the interface schedule, so your scope boundaries are documented rather than assumed.
03
RIBA 5
Provide commissioning assurance for the technology systems that interact with your services.
04
RIBA 6 – 7
Feed operational performance back into the next project’s requirements.
What you receive
We strengthen your technology workstream without competing for ownership of the wider M&E design. The requirements arrive as structured information, at the stage you need them, with the interfaces stated.
✓ A technology brief and load schedule you can design power, containment and cooling against.
✓ An interface schedule that states where each package starts and stops.
✓ Design review input at the stages that matter rather than commentary after issue.
✓ Commissioning assurance for the technology systems that interact with your services.
✓ Realistic capacity figures for comms rooms, risers and cooling before they are sized.
Specialist delivery
Provides network, containment and comms room requirements with real capacity figures.
Provides room-level power, heat and containment requirements for display and audio systems.
Provides door, power and cabling requirements for access control and surveillance.
Start a conversation