Sysflex Technology Group

Our Specialist Brands

Sysflex IT

Sysflex AV

Sysflex Security

Our Group

One group.
Three specialist brands.

Choose one specialist for a defined requirement, or engage the group when the project needs joined-up thinking.

Building Technology Strategy

Agreeing what the technology in a building has to achieve, and who is responsible for delivering it, while the design still has room to absorb the answer.

WHAT WE DO

Discuss a ProjectSee How We Work

01

Business outcomes

02

Technology brief

03

Integration plan

04

Procurement route

The challenge

Technology decisions get made by default.

On most projects the technology brief arrives late and in pieces, from whoever asks first. A room schedule assumes a screen size. An M&E package assumes a containment route. A tender assumes a support model nobody has agreed. By the time those assumptions meet each other the drawings are fixed, and changing them costs real money.

The people who inherit the consequences are the ones who inherit the building: the occupier whose meeting rooms do not suit how they work, the facilities team handed four suppliers and no single escalation route, the project manager absorbing variations that were avoidable. A building technology strategy settles the intent early, so later packages are written against decisions rather than assumptions.

What Sysflex does

From ambition to an agreed position.

Define

Establish the operational outcomes, the users and the constraints, and turn them into a requirement the design team can work to.

Coordinate

Align IT, AV, security and building systems with the architecture, M&E and interiors, and set out who owns each interface.

Assure

Carry the strategy into procurement, commissioning and handover, so what was agreed is what gets delivered.

Sysflex consultants with a client project team

Outcomes

What the client gains

✓ A single technology requirement the whole project team works from, rather than three partial versions.

✓ Fewer late variations, because power, containment, ceilings and acoustics are coordinated while the drawings can still change.

✓ A defined support and ownership position at handover, so the building runs properly from day one.

Across the project

Where this fits in RIBA Stages 0–7

Most valuable at Stages 0 to 2 while the brief is still being written, though a strategy can be established at any point the project needs one agreed position.

01

RIBA 0 – 1

Define

Set the technology ambition alongside the business case and identify the decisions that must be made before design begins.

02

RIBA 2 – 4

Design

Translate the strategy into requirements, coordinate them with the design team and agree the procurement route.

03

RIBA 5

Deliver

Hold the strategy through tender, installation and commissioning, and resolve interface changes as they arise.

04

RIBA 6 – 7

Operate

Review how the building performs against the original intent and feed that into the next phase of work.

Specialist delivery

Delivered with our specialist brands

The group defines the requirement. Our specialist brands provide the detailed design, delivery and support.

Sysflex IT

Digital infrastructure and managed IT

Provides the network, connectivity and identity foundation the rest of the strategy depends on.

About Sysflex IT →

Sysflex AV

Audiovisual and workplace technology

Turns the workplace and meeting room intent into spaces people can actually use.

About Sysflex AV →

Sysflex Security

Physical security systems

Delivers access control and surveillance as part of the building rather than as a separate system.

About Sysflex Security →

Start a conversation

Tell us where the project is—and what needs deciding next.